The completed sign in place, filling the space above the lobby. This sign has been hanging in the Lunder Building at Lesley Art + Design since October 2019.
Ursa fabricated the substrate and hung the finished sign. The paint work on the sign was done by another contractor, who chose to not be credited here. The rear of the sign was painted in the same pink color used on the front.
All projects start with a sketch! We needed three pieces of 3/4” PVC foam board, but pretty good first design.
First fit-up of the three 40”x80” panels. Learned an unfortunate lesson about the VCarve software that resulted in the dadoes not lining up. (We run the CNC router exclusively on Fusion 360 now. Never again, VCarve!)
About half the parts in this run on the CNC plasma cutter are for a mounting bracket that clamped to the building’s structural steel to support an electric winch for hoisting the sign into place.