 The control arm hanger and frame arch were paper-thin and needed replacing. The jig in this photo is welded to the control arm bolt, and two makeshift center punches are welded to the arms. After marking the frame with the ‘center punches,’ Brendan
 The control arm hanger and frame arch were paper-thin and needed replacing. The jig in this photo is welded to the control arm bolt, and two makeshift center punches are welded to the arms. After marking the frame with the ‘center punches,’ Brendan

The control arm hanger and frame arch were paper-thin and needed replacing. The jig in this photo is welded to the control arm bolt, and two makeshift center punches are welded to the arms. After marking the frame with the ‘center punches,’ Brendan was able to perfectly locate the control arm hanger on the new frame repair panel precisely in the factory location.

 Rusted-out frame areas cut away to allow installation of frame repair panel.

Rusted-out frame areas cut away to allow installation of frame repair panel.

 Frame repair panel installed!

Frame repair panel installed!

 Driver’s side floorpan cut out

Driver’s side floorpan cut out

 New Floorpan welded in place

New Floorpan welded in place

1 2 3 4 5
Previous Next
 The control arm hanger and frame arch were paper-thin and needed replacing. The jig in this photo is welded to the control arm bolt, and two makeshift center punches are welded to the arms. After marking the frame with the ‘center punches,’ Brendan
 Rusted-out frame areas cut away to allow installation of frame repair panel.
 Frame repair panel installed!
 Driver’s side floorpan cut out
 New Floorpan welded in place
Ursa Concept
10 Tyler Street,
Somerville, MA, 02143,
United States
2079076676 brendan@ursaconcept.com
Hours
 

(617) 302-7142 | (207) 907-6676 • PO Box 353, Waldoboro, ME 04572

Brendan@Ursaconcept.com